É
ME ON ONE
SOFT GROUND
ROCK
SOFT GROUND
1.
OVERFLOW
TYTAM TUK EAST
He sees a s
TUNNEL
REPAIRS TO WASHOUT AT 15.00071L
CROSS SECTION
ROCK
OVERFLOW
TUNNEL
MOUNT
PARKER
BEACON
HILL
CATCHWATER
F.
CHALLANT kalmakAL MALLS
REPAIRS TO WARMOUT AT 14 500 FT
FRONT
ELEVATION
SHING
MUN
CATCHWATER
72
ALPAIRS TO WASHOUT AT 13,000 FT.
FRONT ELEVATION
CROSS SECTION B. B.
ROCK
SECTION OF RETAINING WALL
ABERDEEN EAST
OVER FLOW
SECTION
CATCHI AREA AKKAAMAT MAY DEPESAR [WIDTH AT, DEPTH OF PAGE WRONE TOTAL PET CLASSENT ALCOVE TO
KARA İMMON ABACIU CHAO) BARS
DREYANCE
(207) "URVEL TORY VLOMBA PLON CHANEL
OVERPOW
Kbantu atayiNGA O DI WIDTHE DEPTE LANGITY, MEDIO WEAD
ÖZDALA SE
MATRA
AGAZDARES
魚
SOFT GROUND
BEACON
G
FE
267
ROCK
www.c
CROSS SECTION
HILL
ATA
5. JA
DATA FOR DESIGN
VELOCI 10,UT DEN. SEG.
VALUES OF R
VALUES OR
C
1
-80 TO
-78
75 TO LON
125
DOC SA Hot
2-4 10 0
D
300 TO 400
HONG
KONG
WATER
SCALE
AS
SHOWN
DETAILS
OF
CATCHWATERS
WORKS
15 1.
KALYAN İSTAN
G47.5
2.AK
24
1446
T
AZON 4.20
610
21
2,640 SCH
Assa
LATE
344
1LZAR.
CATCHWATER
TRAPS I SLOMA IN
SECTION
WHETH AT BARE » 1933 / ARKA DEPTH OF WATCA — BTLE – ALLA MYMANDE
ME A MONTH NO URTEA,
CON LA 7
WITH AT BASE
PLATE NO. 2
No comments yet.
Private notes are available after approval.